Tuesday, April 6, 2010

Here in Precinct #1, we have made March and April our "Ditch Months"! We may also make May part of that as well. We have been using our small excavator to clean out some ditches that have been needing attention such as CR 1607, CR1609, CR 1332, CR 1333, and CR 1335. These are small residential areas that have culverts but were mostly filled in with silt. We also have been busy putting in culverts for several residents on CR 1345, CR1357, CR1455 and CR 1200. We think that a free flowing ditch and culverts are a necessity to maintain our roads in an efficient manner. When the existing ditches dry out this Spring( if they ever do!), our plans are to use the motor grader to pull long stretches of the least populated roads to acheive that goal. We also have been trying to patch the holes after each rain to keep up with our repairs. Hopefully we'll get some warmer weather soon so that we can do some larger road maintenance. One day was spent with a tree service cutting some large trees that had been damaged during the Winter.