Friday, February 12, 2010

The weather continues to be a problem. As we patch and repair the damage to our roads from all the rain, another system passes through before our material hardens and is washed out . But we continue to do what we can to keep up. We now have all of your equipment under roof and out of the weather. The whole project, the all weather materials bunk with concrete walls, the double shed here at the barn, and the single shed at the mixing field, in all cost less than $9,000.00, thanks to our guys who did the construction. In my opinion, dollars well spent. We were able to do some badly needed ditch work on CR 1340 for Mr. Newman. We also installed a culvert for Mr. Robles on CR 1435. Almost all the existing crossroad culverts have been checked and many have been cleaned out or unclogged. We have a fairly large list of projects to complete, such as the drainage ditches in our residential areas, but we will continue to try to keep up with the patching until we get some extended clear weather.